NEWS
You are here: Home / Blogs / 6sets Incinerator Loading To Mombasa With SGS Inspection

6sets Incinerator Loading To Mombasa With SGS Inspection

Views: 7     Author: Site Editor     Publish Time: 2023-03-19      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
telegram sharing button
sharethis sharing button

7th March,6sets Incinerator Loading to Mombasa with SGS Inspection,they're for health care waste treatment.

Incinerator  is the regular products in our company,we provided it to more than 20 countries and regions,and received many feedbacks from customers.

It's equiped with a primary combustion chamber, second combustion chamber and smoke purification room, the waste will be completely decomposed

after high temperature and some deleterious gas will be absorbed by CaO balls as acids neutralize alkalis in the last chamber,thus to achieve smokeless.

微信图片_20220402113634

feedback from Singapore

CHOOSE BETTER, FOR BETTER ENVIRONMENT
CONTACT US
Address: Address: Guanhai road #1501, Zhucheng City, Shandong Province, China 262200
E-mail: sales@better-ept.com
Phone:  +86 13356363253
WhatsApp: +86 13356363253
QUICK LINKS
PRODUCTS
WE’D LIKE TO TALK WITH YOU
Contact Us
Copyright © 2026 Shandong Better Environmental Protection Technology Co., Ltd. All Rights Reserved.