This is the tunnel wastewater treatment project which capacity is 10 cbm/h,based on character of sewage and customers' requirements,we recommend lamellar clarifier combined with sand filter.

Lamella clarifier is a highefficiency combination type sedimentation tank designed on the basis of shallow tank theory.With dense plates or tubes in depression area,suspended impurities will sediment while water flow along those plates or tubes.Separated sludge will settle to the tank bottom by gravity and be discharged from here .This tank can increase  efficiency 50%-60% or treating capacity 3/5 times on the same area.It is used for waste water treatment of electroplate,are dressing printing,leather,food,chemical industry and so on .

微信图片_20221008090119微信图片_20221008090219微信图片_20221008090207

Share Links

Shandong Better Environmental Protection Technology Co., Ltd

Address: Guanhai road #1137, Zhucheng city, Shandong province, China
Post Code: 262200
 Tel:
(+00 86)0536-6085153
 Fax: (+00 86)0536-6073577
 Mobile: (+00 86) 13356363253
 E-mail:sales@better-ept.com
Send Message

Copyright © 2014 Shandong Better Environmental Protection Technology Co., Ltd All rights reserved. Site Map