10m³/H Tunnel Wastewater Treatment Project

Publish Time: 2022-10-13     Origin: Site

This is the tunnel wastewater treatment project which capacity is 10 cbm/h,based on character of sewage and customers' requirements,we recommend lamellar clarifier combined with sand filter.

Lamella clarifier is a highefficiency combination type sedimentation tank designed on the basis of shallow tank theory.With dense plates or tubes in depression area,suspended impurities will sediment while water flow along those plates or tubes.Separated sludge will settle to the tank bottom by gravity and be discharged from here .This tank can increase  efficiency 50%-60% or treating capacity 3/5 times on the same area.It is used for waste water treatment of electroplate,are dressing printing,leather,food,chemical industry and so on .

Contact us

Medical Waste Incinerators In South America Hospital

200TPD Beverage Waste Water Treatment Project in Nigeria

How Does Belt Type Filter Press Work

Remarkable Shandong For Worldwide Trade Held At Zhucheng City

20sets STP Loading For Rural Domestic Wastewater Treatment